Explore the Node-1 architecture
Interactive diagrams and 3D views of STELLAR's first orbital data-center payload: orbit model, payload interfaces, compute path, thermal loop, storage architecture, and verification flow.
500.0 kmINC 97.4°METT+ 0.0 minSUNINSOLATEDNominal Orbit Ops
Receive, validate, stage, infer, checkpoint, store, prioritize, and downlink high-value products within pass windows.

Structure before visualization
| Step | Review area | Purpose |
|---|---|---|
| 01 | Mission baseline | Close orbit, contact, radiation, and link-budget assumptions before architecture claims. |
| 02 | System architecture | Show ground, bus, payload, data, thermal, and verification ownership in one end-to-end view. |
| 03 | Payload ICD | Define the hard boundary between host bus services and payload-owned compute/data/thermal functions. |
| 04 | CONOPS | Prove the system can operate through launch, commissioning, nominal cycles, degraded ops, and safe mode. |
| 05 | Closure evidence | Tie thermal, storage, reliability, and provenance diagrams to testable verification products. |
| 06 | Open actions | Separate closed decisions from draft analyses so the page does not overstate technical maturity. |
Closed assumptions and open analysis items
| Parameter | Value | State | Authority |
|---|---|---|---|
| Orbit | 500 km SSO | Closed | ADR-002 |
| Inclination | 97.4 deg | Closed | ADR-002 |
| Local time | 10:30 LTAN | Closed | ADR-002 |
| Payload allocation | 95 kg hosted | Closed | ADR-001 |
| Thermal load | 838 W peak / 1,200 W rejection | Closed sizing | ADR-003 |
| Compute path | XQRVC1902 FPGA / 26 TOPS + GR740 mgmt | Closed architecture | ADR-004 |
| Storage path | ECC DDR4 + 2 TB RAID-1 + 128 GB queue | Closed architecture | ADR-005 |
| X-band throughput | 100-500 Mbps class | Draft | T07 reconvergence |
Source-to-result system architecture
Node-1 orbital data center · source-to-result architecture
Customer workload, ground segment, host bus, payload compute, thermal control, storage integrity, and verification evidence tracked in one view.
- Customer datatasking files / model input / policy
- Mission operationscommand validation / schedule / health
- Ground stationX-band receive / S-band TT&C
- Delivery systemreceipt · audit replay · customer handoff
Orbit, access, and X-band assumptions
Node-1 · 500 km SSO access model
Closed orbit baseline with the draft X-band throughput envelope visibly separated from the closed ADR facts.
| Elevation | Slant range | Commanded rate | Note |
|---|---|---|---|
| 5° | 2,300 km | 105 Mbps | low elevation acquisition |
| 10° | 1,530 km | 260 Mbps | minimum robust operations |
| 20° | 960 km | 440 Mbps | high-throughput region |
| 30° | 720 km | 500 Mbps | modulator limited |
| 60° | 620 km | 500 Mbps | zenith shoulder |
| 90° | 600 km | 500 Mbps | draft budget zenith |
Hosted payload boundaries and ownership
Payload cutaway · adapter frame · interface boundaries
Commercial host bus boundary, 95 kg payload envelope, compute / storage stack, RF path, cold plate, LHP, and deployable radiators in one traceable view.
- J1Power28 V EPS switched payload bus
- J2DataMission data bus · SpaceWire–Eth bridge
- J3Safe-modeSafe-mode discrete + watchdog
- J4RF · TT&CS-band TT&C telemetry handoff
- T1ThermalThermal clamp · LHP condenser return
- M1Mechanical4× shear-tie mechanical datum set
- POWERbus → payload28 V regulated input · switched load enablesPayload sheds nonessential loads first
- DATApayload → busMission data + health telemetry packetsCheckpoint before reset / pass gap
- THERMALpayload → radiatorCold plate · loop heat pipe · deployable areaThrottle before 838 W case exceeds margin
- MECHbus ↔ payload95 kg hosted envelope · datum set A / B / CLoads close through host adapter frame
- RFpayload → groundX-band mission downlink · S-band TT&C handoffQueue survives lost contact windows
| System area | Scope | Owner |
|---|---|---|
| Host bus | EPS, ADCS, propulsion, launch integration, primary TT&C | Partner spacecraft provider |
| Payload compute | FPGA inference fabric, management CPU, workload isolation, checkpoints | STELLAR payload team |
| Mission data | ingest validation, storage, priority queue, downlink receipts, provenance chain | STELLAR data systems |
| Thermal | cold plates, LHP routing, deployable radiators, throttle rules | Payload thermal + host bus interface |
| Ground segment | command authorization, pass scheduling, X-band receive, delivery reconciliation | Mission operations |
| Subsystem | Technical definition | Design note |
|---|---|---|
| Partner Bus | Power, ADCS, propulsion, launch integration, primary TT&C | Hosted-payload first; free-flyer transition planned for Node-3+ |
| Compute Module | XQRVC1902 rad-tolerant FPGA, 26 TOPS inference; GR740 management processor | Jetson Orin retained as qualified fallback path |
| Storage Stack | 8 GB ECC DDR4 hot cache, 2 TB usable NVMe RAID-1, 128 GB result queue, append-only audit log | ECC scrubbing, integrity checks, and SHA-256 hash-chain provenance |
| Thermal Path | Cold plates, loop heat pipes, and 5.0 m2 deployable radiator panels | 838 W peak heat load; 1,200 W rejection capacity; 43% margin |
| Mission Data Link | S-band command/telemetry plus X-band mission downlink with adaptive coding and modulation | Draft budget targets 100-500 Mbps class X-band by elevation and ground dish |
Recoverable per-orbit CONOPS
Thermal, storage, and provenance constraints
96-minute orbit · heat rejection closure
40-minute peak compute run, 20-minute cooldown reserve, eclipse derate, and X-band contact passes — all balanced inside a 1,200 W radiator envelope.
- Peak waste heat838 W
- Radiator capacity1,200 W
- Rejection margin43%
- Radiator area5.0 m2
- Peak compute run40 min
- Cooldown reserve20 min
Radiation-aware storage and provenance chain
| Tier | Capacity | Protection | Fault | Recovery action |
|---|---|---|---|---|
T1 DDR4 hot cache | 8 GB per compute node | ECC + 15 minute scrub | SEU bit flip | correct, scrub, checkpoint |
T2 NVMe mission store | 2 TB usable RAID-1 | mirrored writes + integrity verification | device or block fault | mirror read, rebuild, quarantine |
T3 Result priority queue | 128 GB partition | contact-aware ranking and resumable transfer | pass gap or storage pressure | rank, expire, downlink first |
T4 Append-only audit log | SHA-256 hash chain | tamper-evident provenance | delivery dispute | replay manifest and receipt chain |
Trace every claim to an evidence product
Requirements-to-evidence traceability
| ID | Requirement / claim | Authority | Evidence product | State |
|---|---|---|---|---|
| MDR-01 | Mission geometry closes against 500 km SSO, 97.4 deg inclination, 10:30 LTAN. | ADR-002 | STK / GMAT access and eclipse report | Closed baseline |
| MDR-02 | Hosted payload remains inside 95 kg allocation and isolates bus-owned services from payload-owned functions. | ADR-001 | Payload ICD, mass properties register, adapter load path review | Closed architecture |
| MDR-03 | Compute stack supports radiation-tolerant inference path with management processor recovery supervision. | ADR-004 | FPGA benchmark plan, GR740 watchdog sequence, checkpoint/restart test | Verification required |
| MDR-04 | Peak waste heat can be rejected with radiator margin through the orbital duty cycle. | ADR-003 | Thermal Desktop / SINDA hot case, eclipse case, degraded-mode throttle case | Closed sizing |
| MDR-05 | Mission products survive SEU, reset, pass gap, and storage pressure without provenance loss. | ADR-005 | ECC scrub test, RAID-1 fault injection, hash-chain replay | Verification required |
| MDR-06 | X-band downlink class is traceable to a reconverged link budget at the closed orbit altitude. | T07 draft | RF link budget update from 600 km draft to 500 km ADR baseline | Open action |
Authoritative tools behind the browser surface
Authoritative tools feeding the visual layer
| Domain | Tool family | Engineering role | Artifact consumed |
|---|---|---|---|
| Mission access | Ansys STK / ODTK | Coverage, access, comm geometry, conjunction screening, and operations playback. | access report / CZML |
| Flight dynamics | NASA GMAT | Orbit analysis, maneuver planning, Monte Carlo cases, and operations support. | ephemeris / maneuver file |
| Reference geometry | NASA SPICE / NAIF | Frames, time systems, pointing, observation geometry, and mission kernels. | SPK / CK / FK kernels |
| Flight software math | Orekit | Propagators, frames, attitude, events, and ground/onboard astrodynamics services. | propagation service |
| Web digital twin | CesiumJS | High-precision WGS84 globe, ephemeris playback, 3D Tiles, and review publication. | interactive 3D ops layer |
| RF and comms | MATLAB SatCom Toolbox | Time-varying access, link budgets, RF/optical analysis, propagation, and waveform tests. | link budget and ACM table |
| Thermal closure | Thermal Desktop / SINDA | CAD-based spacecraft thermal models, radiators, heat pipes, orbital cases, and correlation. | thermal case matrix |
| Sizing trades | OpenMDAO | Mass, power, thermal, contact time, cost, and reliability multidisciplinary trades. | trade study run set |
Open technical actions that must not be hidden
| Action | Required work | Evidence owner | State |
|---|---|---|---|
| RF-01 | Reconverge X-band link budget from 600 km draft range to closed 500 km SSO baseline. | T07 link budget | Open |
| TVAC-01 | Correlate 838 W peak compute thermal case against deployable radiator hot/cold cases. | Thermal Desktop / SINDA | Planned |
| FSW-01 | Run checkpoint/restart fault injection against FPGA reset, GR740 watchdog, and storage pressure cases. | SIL / interface emulation | Planned |
| OPS-01 | Generate commissioning sequence with explicit L+24 h payload power-on and L+48 h initial downlink gates. | CONOPS | Planned |